Page 1 of 1

Changin reference flow in a copied process

Posted: 28 Nov 2014 03:45
by pascal.lesage
H all

Sorry for inundating the forum...

I was wondering if there was any way to change the reference flow to a copied process. I find it convenient sometimes to copy a given process as a template for modelling something else. However, although I am able to add new flows, I am unable to delete the original reference flow.

The trick I have found is to allocate 100% of flows to the "new" reference product, but there may be a cleaner way.

Thanks
Pascal

Re: Changin reference flow in a copied process

Posted: 18 Dec 2014 15:47
by msrocka
Hi Pascal,

You can change the reference flow on the 'General information' page of the process editor. After this it is possible to delete the old reference flow.

Best regards,
Michael

Re: Changin reference flow in a copied process

Posted: 18 Dec 2014 17:14
by pascal.lesage
Indeed, works like a charm.

Thank you,
Pascal