Changin reference flow in a copied process
Posted: 28 Nov 2014 03:45
H all
Sorry for inundating the forum...
I was wondering if there was any way to change the reference flow to a copied process. I find it convenient sometimes to copy a given process as a template for modelling something else. However, although I am able to add new flows, I am unable to delete the original reference flow.
The trick I have found is to allocate 100% of flows to the "new" reference product, but there may be a cleaner way.
Thanks
Pascal
Sorry for inundating the forum...
I was wondering if there was any way to change the reference flow to a copied process. I find it convenient sometimes to copy a given process as a template for modelling something else. However, although I am able to add new flows, I am unable to delete the original reference flow.
The trick I have found is to allocate 100% of flows to the "new" reference product, but there may be a cleaner way.
Thanks
Pascal