Hi Andreas,
It is possible to add the flow-specific cost flows in the Cost tab (because I didn't not see how this is possible with openLCA 1.4 beta 3), or are you suggesting that economic flows need to be created in the Input/Output tab?
Thanks, Wes
Search found 4 matches
- 17 Mar 2014 21:30
- Forum: openLCA 1.4
- Topic: Cost
- Replies: 2
- Views: 4379
Cost
When I try to add a process cost, and create a new Cost category, that category does not get added to the Flows list, so it appears to be impossible to create a correponding LCIA method to do life cycle costing.
- 21 Jun 2011 23:52
- Forum: Import
- Topic: LCIA import to match to existing flows
- Replies: 0
- Views: 6412
LCIA import to match to existing flows
Hello OpenLCA Team, We have existing flows in an OpenLCA database that were imported together with GaBi processes. We are trying to import LCIA methods that map to those flows. Because you cannot export LCIA methods from GaBi, we have been created the methods in Excel in the EcoSpoldAccess template ...
- 21 Jun 2011 17:43
- Forum: Installation
- Topic: Problems with using non-embedded MySQL server
- Replies: 1
- Views: 6032
Problems with using non-embedded MySQL server
Hello OpenLCA team, We are trying to configure OpenLCA to work with a MySQL server that is installed independently on a PC (Windows 7). We see multiple advantanges to this including being able to point the MySQL data directory to the place of our choice, being able to access the data outside of Open...